Delivery and Tilt-up
Loaded and ready to roll
After curing in the factory, the 12-foot hempcrete panels were transported 60 miles through the redwoods by JZ Contracting and installed on site by Max Niehaus Construction with remarkable precision.
1-Day Wall Assembly
The walls were set, aligned, and secured to the slab; the roof framing and structural fastening followed.
This stage showcased the speed and efficiency of tilt-up, factory-built natural wall systems, reducing on-site construction time while ensuring exceptional performance and build quality.